FUTURE PATCH - Bus Cable
In stock
SKU
5600040
The AIM system FUTURE-PATCH is part of a ultra modern DCIM solution for managing complex IT infrastructure. The physical status of all patch panel ports is monitored and managed in real time with this system.The bus system connects the RCU with all PCUs in a rack and realises the data exchange and the power supply.
The bus system consists of a bus cable with a termination on each end and several positions to connect the PCUs via bus connector.
Overview technical data |
|||
Length [m] per drum |
25 | ||
Colour |
black with red indicator |
Properties | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
AIM version: | V2 |
Product Video - AIMready - How to retrofit V2
Product Video - AIM - How to monitor port status